Don t ignore this because water leakage under a concrete foundation can cause additional problems.
Drain pipes in concrete slab.
The concrete slab covers the sewer drain pipes located under the slab.
See our pages checking over the concrete slab drain pipes and plumbing in the walls for other items to review and check.
It s also much less money to do the trenchless pipe repairs than by digging for pipe replacement.
Below are a some under slab plumbing diagrams that are relatively common.
During the plumbing slab construction the pipes are buried in gravel or sand beneath the slab and are obviously difficult to access.
Collapsed drain pipes under a concrete slab aren t the end of the world.
Under slab plumbing diagrams.
Otherwise the ensuing leak could cause damage.
He will dig trenches as needed to run the sewer pipes and.
The good news for you is that there are modern alternatives to repairing the cast iron drain pipes under your slab without having to excavate through the floor or digging from outside of your property.
These plumbing sewer pipes should be checked anytime there had been significant foundation movement or foundation repair.
How to cut a concrete floor for new plumbing.
Concrete slab foundations that encase the home s plumbing lines also called under slab plumbing could have pipes made of copper cast iron or galvanized steel and these materials are prone to decay over time.
Building and plumbing a house takes skill perseverance precision and aptitude.
Have your plumber ready to come right away after the fill is spread and compacted under the slab.
When a drain pipe breaks under a slab the pipe must be located and repaired.
At this point you will no longer see the horizontal drainpipes and the main sewer line but you will see the stubs that extend vertically out of the sand.
Before the concrete trucks come the contractor fills in the area over the network of plumbing pipes and drain lines with compacted sand.
You can stub out pipes in a concrete slab easily because the stub out is put in place before the final grade for the concrete slab is prepared but you must be very skilled in making the necessary connections for the pipes.
Plumbing systems in concrete slabs go in before the concrete is poured as they are installed beneath the slab.
But before you can even pour the slab the building inspector must first approve and sign off on the drain waste vent or dwv system.